Beijer-electronics iX Panel TA100 EN Instrukcja Użytkownika Strona 6

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 23
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 5
Installation
2Installation
2.1 SpaceRequirements
Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
Space requirements when installing the operator panel:
58 mm
228 mm
302 mm
100 mm
(4.0 inch)
100 mm
(4.0 inch)
50 mm
(2.0 inch)
50 mm
(2.0 inch)
100 mm
(4.0 inch)
(2.28 inch)
(11.89 inch)
(8.98 inch)
Caution:
Theopeningsontheenclosureareforairconvection. Donotcovertheseopenings.
2.2 InstallationProcess
1.
Unpack and check the delivery. If damage is found, notify the supplier.
x 13
Panel cut out 264.5 x 206.0 mm
(10.41 x 8.11 inch)
Note:
Placetheoperatorpanelo nastablesurfaced uringinstallation.
Droppingitorlettingitfallmaycausedamage.
BeijerElectronics, MAEN010A
6
Przeglądanie stron 5
1 2 3 4 5 6 7 8 9 10 11 ... 22 23

Komentarze do niniejszej Instrukcji

Brak uwag