Beijer-electronics iX Panel TA70 EN Instrukcja Użytkownika Strona 42

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 45
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 41
Software
Requirements
Upgrading of the operator panel system program requires the following:
APC
An Ethernet connection between the PC and the operator panel or an empty
USB memory stick.
The Image Loader executable file from the web site
UpgradingtheSystemProgramUsingaUSBMemory
Stick
When upgrading the system program using a memory stick, you can select to
delete or to keep the project in the operator panel.
Follow the steps below:
1.
Connect an empty USB memory stick to your PC.
2.
Double-click on the executable Image Loader file.
3.
Select the drive of the desired USB stick and click Create.
The files are copied to the USB stick.
4.
Connect the USB memory stick to the operator panel.
5.
Cyclethepowertoinitiatetheupgrade.
UpgradingtheSystemProgramviaEthernet
When upgrading the system program via Ethernet, t he project in the operator
panel is retained.
Follow the steps below:
1.
Make sure tha t your PC and the operator panel are connected via Ethernet.
2.
Double-click on the executable Image Loader file.
3.
Enter the IP address of t he operator panel.
4.
Click Update, and follow the instructions.
The files are transferred to the operator panel. The panel will reboot
automatically when the transfer is finished.
BeijerElectronics, MAEN012A
42
Przeglądanie stron 41
1 2 ... 37 38 39 40 41 42 43 44 45

Komentarze do niniejszej Instrukcji

Brak uwag