Beijer-electronics iX T7AM EN Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Panel sterowania Beijer-electronics iX T7AM EN. Beijer Electronics iX T7AM EN User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - InstallationManual

iXT7AMInstallationManualEnglishMAEN118A,2013-06

Strona 2 - Foreword

Installation2.2.2 OtherConnectionsandPeripheralsCables, peripheral equipment and accesso ries must be suitable for the applicationand its environment.

Strona 3 - Contents

Technical Data3TechnicalDataParameter iX T7AMFrontpanel,W×H×D 204×143×7mmCutoutdimensions,W×H187×126mmMountingdepth 43mm(143mmincludingclearance)Stand

Strona 4 - 1SafetyPrecautions

Technical DataParameter iX T7AMOperatingtemperature-10°Cto+60°CStoragetemperature -20°Cto+70°CRe lativehumidity <85%non-condensedApprovalsandcertifi

Strona 5 - 1.3 DuringInstallation

Chemical Resistance4 ChemicalResistance4.1 MetalCasingThe frame and casing material is powder-coated aluminum. This powder paintwithstands exposure to

Strona 6 - 1.6 DismantlingandScrapping

Chemical Resistance4.2 TouchScreenandOverlay4.2.1 AutoflexEBA180LAutoflex EBA 180L covers the overlay surrounding the touch screen.SolventResistanceAuto

Strona 7 - 2Installation

Chemical Resistance4.2.2 TouchScreenSurfaceThe touch screen surface on the operator panel withstands exposure to thefollowing solvents without visible

Strona 8 - 2.2 InstallationProcess

Operator Panel Drawings5 Opera torPanelDrawings5.1 Connectors1234COM 3/4LANCOM 1/2Pos. Connector Description1 Powersupply +24VDC(18-32VDC)2 COM1/2 Com

Strona 9 - 2.2.1 Connectionstoth

Operator Panel Drawings5.3 iXT7AMOutlineCOM3 RS232COM4 RS422/RS485COM1 RS232 /COM2 RS422/RS485Ethernet24 V DCExpansion portUSB hostSD memorycard slot1

Strona 10 - Installation

Additional Installation Tips6 AdditionalInstallationTipsWhen experiencing communication problems in for example noisy environmentsor when operating cl

Strona 11 - 3TechnicalData

Additional Installation TipsNote:Thegroundingwiresshouldbeshortandtheconductorshouldhavealargearea.Along,thingroundingwirehasav eryhighimpedance(resis

Strona 12 - Technical Data

ForewordInstallationmanualforiXT7AMForewordAll are developed to satisfy the demands of human-machine communication.Built-in functions such as displayi

Strona 13 - 4 ChemicalResistance

Additional Installation TipsA good solution may be to use a shielded Ethernet cable, but to connect the shieldat one end only.One option is t o break

Strona 14 - 4.2 TouchScreenandOverlay

Additional Installation Tips6.3 ToAchieveBetterEMCProtection• Initially, use the original cabling from Beijer Electronics primarily.• Use shielded cab

Strona 15 - 4.2.3 Autotex

Additional Installation Tips6.4 AmbientTemperatureThe maximum ambient temperature for the operator panel is provided in thespecifications. The ambient

Strona 16 - 5 Opera torPanelDrawings

Additional Installation Tips6.5 SafetyMost of the operator panels are fed with 24 V DC.412434Power supply230 V AC to 24 V DCPower supply230 V AC to 24

Strona 17 - 5.3 iXT7AMOutline

Additional Installation Tips6.6 GalvanicIsolationUSBUSBRS232RS422/485+24 V DC0 VFilterDC/DCgalvanic isolationVCC0 V (GND)DC/ACCFLEthernetInternal elec

Strona 18 - 6 AdditionalInstallationTips

Additional Installation Tips6.7 CableandBusTe rminationRS485• If max imum transfer distance and maximum transfer speed is needed,shielded and twisted

Strona 19 - OperatorPanel

ContentsContents1 Safety Precautions ... 41.1 UL and cUL Installation ...

Strona 20 - BeijerElectronics, MAEN118A

Safety Precautions1SafetyPrecautionsBoth the installer and the owner and/or operator of the operator panel must readand understand this installation m

Strona 21

Safety Precautions• To make wiring connections to the power supply connector, follow the tablewith cable and torque specifications below:TerminalBlockN

Strona 22 - 6.4 AmbientTemperature

Safety Precautions• Ground the product according to the accompanying installation instructions.• Only qualified personnel may install the operator pane

Strona 23 - 6.5 Safety

Installation2Installation2.1 SpaceRequirements• Maximum inst a llation plate thickness: 11 mm• Space requirements in millimeters when ins talling the

Strona 24 - 6.6 GalvanicIsolation

Installation2.2 InstallationProcessThe following is needed:• A Phillips/slot screwdriver1.Unpack and check the delivery. If damage is found, notify th

Strona 25

Installation4.Connect the cables in the specified order, according to the drawing and stepsbelow.Caution:• Ensurethattheoperatorpanelandthecontrollersy

Komentarze do niniejszej Instrukcji

Brak uwag